Job description painter-plasterer. Job description of the plasterer-painter Description of work, tasks and job responsibilities

1.1. A construction painter of the 5th category is a worker and reports directly to ……… (name of the position / profession of the manager)

1.2. To work as a building painter of the 5th category, a person is accepted:

1) who has mastered the basic vocational training programs - vocational training programs for workers' professions, workers' retraining programs, workers' qualification improvement programs;

2) having experience of professional activity in performing the labor functions of a building painter of the 4th category for at least 2 months.

1.3. A person is allowed to work specified in clause 1.2 of this instruction:

1) passed training in safe methods and techniques for performing work, instruction on labor protection (induction and at the workplace), internship at the workplace and testing of knowledge of labor protection requirements in accordance with the Procedure for training on labor protection and testing knowledge of labor protection requirements of employees of organizations, approved Resolution of the Ministry of Labor of Russia and the Ministry of Education of Russia of 13.01.2003 N 1/29;

2) passed mandatory preliminary (upon admission to work) and periodic medical examinations (examinations), as well as extraordinary medical examinations (examinations) in accordance with the Procedure for conducting mandatory preliminary and periodic medical examinations (examinations) of workers engaged in heavy work and at work with harmful and (or) dangerous working conditions, approved. By order of the Ministry of Health and Social Development of Russia of 12.04.2011 N 302n.

1.4. Construction painter of the 5th grade is allowed for independent steeplejack work (at a height of more than 5 m), provided that the employee undergoes additional instructions.

1.5. Construction painter of the 5th category should know:

1) documents, objects, methods and techniques for performing work of lower qualifications, provided for by production (by profession) instructions and (or) professional standard;

2) methods and rules:

Performing painting works for decorative coating;

Relief formation and textured coloring;

Airbrush surface finishing and decorative varnishing;

Bronzing, gilding and silvering of surfaces;

Pasting surfaces with wallpaper;

3) design and operating rules for high-pressure painting units;

4) methods and techniques for copying and cutting stencils, a tool for copying and cutting stencils;

5) methods of selection and drawing up of stencils, paint compositions;

6) the rules of color formation and methods of mixing pigments, taking into account their chemical interaction;

7) rules and methods of tonal scale compilation;

8) types of paintings and fonts;

9) methods and techniques for painting surfaces;

10) methods of covering surfaces for valuable species of wood and stone;

11) assortment, marking, basic properties of high-quality, leatherette and wood wallpapers;

12) rules for the operation of tools and devices used when gluing and replacing wallpaper;

13) safety rules when working with paints and varnishes;

14) requirements for the quality of work performed;

15) ……… (other requirements for the necessary knowledge)

1.6. Construction painter of the 5th category should be able to:

1) perform work (operations, actions) at lower grades;

2) use:

Power tools and high pressure units when painting surfaces;

Tools and devices for facing, fluting surfaces and pulling out panels with underfloor;

Tools and devices for fixing stencils on the surface;

Tools and devices for painting surfaces in two or more tones;

Tools and devices for decorative surface coating;

Tools and devices for wall surface finishing with adhesives;

Tools and devices for copying and cutting stencils of any complexity;

A tool for surface finishing with decorative chips;

Airbrushing tools and equipment;

Tools and equipment for decorative varnishing of surfaces;

Tool for coating surfaces in bronze, gold and silver;

Tools and devices for making ornamental and volumetric painting;

A tool for painting surfaces according to drawings and sketches, by hand according to powder;

Tools and devices for pasting surfaces;

Tools and devices for changing wallpaper;

3) apply stencils to the surface;

4) form a relief on the surface to be treated and perform textured painting using a special tool;

5) draw up tonal ranges of especially complex paint compositions according to samples;

6) ensure a bubble-free and peel-free fit of high-quality wallpaper, leatherette, wood wallpaper glued to the surface;

7) ……… (other requirements for necessary skills)

1.7. ……… (other general provisions)

2. Labor functions

2.1. The labor functions of a 5th grade construction painter are:

2.1.1. Performing complex works when decorating walls and ceilings:

1) finishing of wall surfaces in two or more tones;

2) artistic finishing and surface repair;

3) decoration of walls and ceilings with high quality wallpaper.

2.1.2. Management of construction painters of lower qualifications (category).

2.2. ……… (other functions)

3. Responsibilities

3.1. Before the start of the working day (shift), a building painter of the 5th category:

1) undergoes a pre-shift (preventive) medical examination in accordance with the established procedure;

2) receives a production assignment;

3) undergoes, if necessary, instruction on labor protection;

4) takes a shift;

5) checks the serviceability of devices, tools, inventory and personal protective equipment;

6) ……… (other duties)

3.2. In the process of work, a building painter of the 5th category:

1) performs work for which he has been instructed and authorized to work;

2) uses overalls, safety footwear and other personal protective equipment;

3) receives instructions from the immediate supervisor on the implementation of the task, safe techniques and methods of work;

4) complies with the rules for the use of technological equipment, devices and tools, methods and techniques for the safe performance of work;

5) immediately notify the immediate supervisor of all shortcomings discovered during work;

6) complies with the requirements of personal hygiene and industrial sanitation;

7) ……… (other duties)

3.3. During the working day (shift), the construction painter of the 5th category performs the following duties within the framework of labor functions:

3.3.1. Within the framework of the labor function specified in subparagraph 1 of paragraph 2.1.1 of this instruction:

1) carries out painting of surfaces with a power tool and high-pressure units;

2) performs facing and fluting of surfaces;

3) pulls out panels with underfloor;

4) carries out staining on a stencil in two or more tones;

5) performs decorative coating of surfaces in one or several tones;

6) performs decorative coating of surfaces like wood and stone;

7) finishes wall surfaces according to sketches with adhesives in two to four tones;

8) carries out copying and cutting of stencils of any complexity;

9) prepares paint compositions of the required tone with the number of pigments not exceeding four;

10) finishes surfaces with a spray, colored decorative crumbs.

3.3.2. Within the framework of the labor function specified in subparagraph 2 of paragraph 2.1.1 of this instruction:

1) carries out embossed and textured painting of surfaces;

2) makes surface finishing with airbrushing;

3) performs decorative varnishing;

4) performs bronzing, gilding and silvering of surfaces;

5) carries out ornamental painting in several tones;

6) perform volumetric painting;

7) performs hand-painted surfaces.

3.3.3. Within the framework of the labor function specified in subparagraph 3 of paragraph 2.1.1 of this instruction:

1) Carries out pasting of surfaces with high-quality wallpaper with a density of more than 180 g / m2;

2) Carries out pasting of walls and ceilings with leatherette and wood wallpaper;

3) replaces the back-to-back wallpaper.

3.3.4. Within the framework of the labor function specified in clause 2.1.2 of this instruction:

1) issues construction painters of lower qualifications (category) tasks for the shift;

2) organizes and coordinates the work of construction painters of lower qualifications (category);

3) gives instructions and explanations on the performance of work to construction painters of lower qualifications (category);

4) monitors the quality of work performed by construction painters of lower qualifications (category).

3.4. At the end of the working day (shift), construction painter of the 5th category:

1) brings devices, tools into proper condition, transfers them to storage;

2) removes dirt from workwear and safety footwear, if necessary, places it for drying and storage;

3) submits the established reporting;

4) performs an inspection (self-examination);

5) hand over the shift;

6) ……… (other duties)

3.5. As part of the performance of his labor functions, a building painter of the 5th category:

1) fulfills the instructions of his immediate supervisor;

2) undergoes periodic medical examinations (examinations), as well as extraordinary medical examinations (examinations) in accordance with the procedure established by the legislation of the Russian Federation;

3) ……… (other duties)

3.6. ……… (other provisions on responsibilities)

4. Rights

4.1. When performing his labor functions and duties, a construction painter of the 5th category has labor rights provided for by an employment contract concluded with an employee, the Internal Labor Regulations, local regulations, the Labor Code of the Russian Federation and other acts of labor legislation.

4.2. ……… (other provisions on employee rights)

5. Responsibility

5.1. A building painter of the 5th category is brought to disciplinary responsibility in accordance with Art. 192 of the Labor Code of the Russian Federation for improper performance through his fault of the duties listed in this instruction.

5.2. The building painter of the 5th category is financially responsible for ensuring the safety of the inventory items entrusted to him.

5.3. A building painter of the 5th category for committing offenses in the course of his work, depending on their nature and consequences, is brought to administrative and criminal liability in the manner prescribed by law.

5.4. ……… (other liability provisions)

6. Final provisions

6.1. This instruction was developed on the basis of the Professional standard "" approved by the Order of the Ministry of Labor and Social Protection of the Russian Federation dated December 25, 2014 N 1138n, taking into account ......... (details of the organization's local regulations)

6.2. Familiarization of the employee with this job description is carried out when hiring (before signing an employment contract).

The fact of familiarization of the employee with this job description is confirmed by ……… (signature on the familiarization sheet, which is an integral part of this manual (in the job description familiarization log); in a copy of the job description kept by the employer; in another way)

6.3. ……… (other final provisions).

OFFICIAL INSTRUCTIONS N _ MALARA - PLASTER IV category of REPAIR AND MAINTENANCE SERVICE

1. GENERAL PROVISIONS

1.1. The main task of the painter-plasterer is 4 rubles. is the execution of works of medium complexity on painting, pasting, surface repair, surface plastering and plaster repair.

1.2. Painter-plasterer 4 rubles appointed and dismissed by the director of the Enterprise after agreement with the leading engineer of the RES.

1.3. For the position of a painter-plasterer 4 rubles. persons who have reached the age of 18 with secondary education and special vocational training are appointed.

1.4. Painter-plasterer 4 rubles reports directly to the leading engineer of the RES.

1.5. During his absence, his duties are performed by another painter-plasterer appointed by order of the director.

1.6 Painter-plasterer 4p. must know:

Requirements for a surface prepared for high-quality painting, wallpapering and lincrust;

Compositions and methods of preparation of decorative mortars, mortars for special-purpose plaster and concrete for shotcrete;

Methods for the production of work on improved surface painting and pasting them with wallpaper and linkrust;

Types and properties of retarders and setting accelerators;

Requirements for the quality of materials used in the production of painting, wallpaper and plastering works;

Properties of solutions with chemical additives (chloride solutions, solutions with the addition of potash, calcium chloride) and rules for handling them;

Requirements for the quality of painting, wallpaper and plastering works;

Methods for performing improved plaster;

Methods for preparing paint compositions;

Methods for wetting surfaces;

Arrangement of mechanisms and power tools with a working pressure of up to 15 kg / cm2 and rules for working with them;

Installation of mortar pumps, cement guns and nozzles for them;

Ways of cutting wallpaper;

Methods for mechanized application of solutions and gunning of surfaces;

Requirements for the quality of plastering works;

Resolutions, orders, orders of higher authorities, methodological, normative and other guidance materials concerning the work of the painter-plasterer;

The structure and organization of the department and the sanatorium;

- 2. FUNCTIONS OF THE EMPLOYEE

2.1. Site of work of a painter-plasterer 4 rubles. is the performance of work of medium complexity in plastering, painting, pasting, surface repair and repair of plaster on fixed objects.

The working place of the painter-plasterer is the medical, sleeping buildings of the sanatorium; dining room premises; other objects of the sanatorium where painting and plastering works are carried out.

2.2. Painter-plasterer 4 rubles:

2.2.1. Prepares his workplace.

2.2.2. Carries out periodic inspection of the state of serviced objects.

2.2.3. Produces puttying, surface finishing and priming of surfaces for high-quality painting by hand and with a power tool.

2.2.4. Carries out painting by hand and mechanized.

2.2.5. Prepares putty, priming and painting compositions.

2.2.6. Produces a sandless coating for high quality coloring.

2.2.7. Carries out pasting of surfaces with plain wallpaper, medium density or fabrics.

2.2.8. Wetting out surfaces. Applies plaster mortar to the surface in a mechanized way.

2.2.9. Performs improved manual plastering of surfaces (walls, ceilings, smooth posts, pilasters, sloped niches, beams of constant cross-section) and plaster repair.

2.2.10. Prepares decorative, heat-insulating, waterproofing mortars.

2.2.11. Carries out stretching panels, printing stencils in one tone.

3. OFFICE RESPONSIBILITIES

A painter-plasterer of the 4th category is obliged:

3.1. Perform the functions assigned to it in a quality and timely manner in accordance with the requirements of the current legislation, regulations, regulations, instructions and orders of the administration.

3.2. Complete the daily quests received from the Vedas. RES engineer and assignments in accordance with the approved work plan.

3.3. Put on overalls (cotton suit, leather boots, combined mittens), check the availability and serviceability of tools, protective equipment, working equipment. Inform the ved. to the RES engineer about all noticed faults or violations.

3.4. To make putty, primer, surface primer for simple painting with aqueous compounds (glue and casein), oil, enamel and synthetic paints by hand by applying putty on the surface with a spatula or paint sprayers SO-6B, SO-19B.

3.5. Put putty on the surface after cleaning, smoothing the surfaces before glue, casein painting and before oil, enamel, synthetic paints of plaster and concrete surfaces, jointing cracks in concrete and plastered surfaces, cutting out knots in wooden surfaces, finishing wood, concrete, plastered and metal surfaces , grinding greased places.

3.6. Carry out the rolling on wooden, plastered, concrete and metal surfaces after cleaning, smoothing the plastered and concrete surfaces, joining cracks.

3.7. Before painting surfaces with aqueous compounds (glue, casein), apply a primer after cleaning, smoothing the surface, joining cracks. Apply a primer to wooden, plastered and concrete surfaces before oil, enamel and synthetic paints after pro-polishing, putty and all the preceding technological processes listed above.

3.8. The putty and the primer are usually applied two times before high-quality painting.

3.9. Preparation and improved painting should be performed in the following technological sequence:

A) water compositions (glue, casein):

Smoothing surfaces;

Facing cracks;

First primer;

Partial grease;

Grinding of greased places;

Second priming for glue painting of surfaces;

Coloring;

B) oil, enamel and synthetic paints:

Cleaning surfaces from dirt, dust, solution drips;

Smoothing surfaces when painting on plaster and concrete;

Cutting of knots and pitching with jointing of cracks when painting on wood;

Facing cracks when painting on plaster and concrete;

Rolling of wooden, plastered, concrete and metal surfaces;

Partial lubrication with pro-olifting;

Grinding of greased places;

Solid putty;

Grinding;

Primer;

Fluting of wooden, plastered and concrete surfaces;

Sanding wood, plaster and concrete surfaces;

First painting;

Fluting;

Grinding;

Second color;

Fluting and facing.

3.10. Preparation for improved coloring and improved coloring should be performed:

A) hand tools: spatulas (wooden, steel, rubber) for greasing cracks, cleaning and smoothing the surface;

Steel brushes for cleaning metal surfaces;

Special brushes with elongated handles and curved tips;

Combs and knurling rollers for applying glue and oil colors and cutting the surface under a tree;

B) by mechanized methods:

Hand-held spray guns SO-133, SO-20V when painting with glue, water and lime compositions when performing small amounts of work;

Paint sprayers SO-6B, SO-19B for applying adhesive and oil compositions, putty;

Injection tanks SO-12A, B, SO-13A, painting units SO-5A, B, SO-158, SO-154, 2600TSA for painting large surfaces of radiators, pipes, doors, windows, walls, ceilings, etc.

3.11. Preparation of putty, priming, painting compositions.

3.11.1. Preparation of primers:

A) in the absence of a ready-made prefabricated putty for a plastered surface, prepare a primer of the following composition:

Lime dough - 2.5 kg;

Water - 5 l;

Salt - 100 g (pre-dissolve salt in hot water);

B) prepare a primer under the glue paint:

Alum potassium alum - 300g;

Laundry soap - 200 g;

Animal glue - 1.5 l;

Drying oil - 25-30g;

Chalk - 1.5 - 2.5 kg;

B) for metal surfaces, prepare a primer for painting from three parts of drying oil or gryftal varnish, dissolved in two parts of yellow zinc paint.

3.11.2. Preparation of putties:

A) prepare a putty of the following composition under water-based paint compositions:

for 1 liter of 10% glue solution, take 25 g of drying oil and 2.5 kg of sifted chalk, pour drying oil into the heated glue solution and mix;

B) for a continuous putty for oil paint (floors, window frames, doors and other surfaces), prepare a putty of the following composition:

Drying oil - 1 kg;

Desiccant - 50 g;

Liquid glue - 200 g;

Laundry soap - 20 g;

Ground chalk - up to working viscosity.

3.11.3. Preparation of paint compositions:

A) prepare the whitewash composition by dissolving the lime dough in water to a working state, add ocher and blue;

B) prepare glue paint separately by soaking sifted chalk and dry pigments (ultramarine, chromium oxide, red lead, graphite, etc.) in water and bring them to a creamy state;

B) dissolve the thickened oil paint with linseed oil and mix thoroughly until it works;

D) to prepare a color scheme from several paints, dilute each of them separately with linseed oil to a working density, then gradually add others to the main paint and mix thoroughly.

3.12. The device is a sandless coating for high-quality painting.

Prepare a solution for 1 m of surface consisting of building gypsum - 1.2 kg, lime dough - 300 g and mix thoroughly, adding water in small portions;

Apply the ready-made solution to the concrete surface with a smoothing of the cover with a spatula;

After the prepared solution has been produced, the next portion is prepared.

3.13. Pasting of surfaces with plain, medium-density wallpaper or fabrics is carried out:

Wallpapering - on leveled, cleaned and dried surfaces;

Pasting surfaces with plain and medium density wallpaper should be performed in the technological sequence: cleaning from the top of the walls, cleaning the surface of the walls, applying an adhesive composition (CMC glue) to the surface of the walls, correcting uneven places with putty; sanding of putty places with pumice stone, pasting with paper, applying an adhesive composition to wallpaper panels, films, gluing wallpaper panels with an overlap;

Pasting surfaces with polyvinyl chloride films on a fabric base should be performed in the following technological sequence: cleaning from the top of the walls with a spatula, cleaning the surface of the walls, priming the surface of the walls with a soap-maker, solid filling the surfaces of walls or ceilings, grinding the surfaces with pumice, applying an adhesive around the perimeter of walls and openings, applying adhesive composition on the surface of walls, application of adhesive composition on panels of wallpaper, films, gluing panels of wallpaper, films end-to-end;

Before gluing, cut the sheets of wallpaper into pieces of the required length, cut their edges on one side with long scissors or a sharp knife;

The panel to be glued is smoothed over the attached blank sheet of paper to prevent dirt and smudging of the wallpaper pattern;

After adding the first panel, the second panel is glued so that the adjacent panels give a single pattern;

The surfaces covered with wallpaper should be protected from direct exposure to sunlight and drafts until they are completely dry;

The surfaces covered with wallpaper should be free of bubbles and stains, all panels should have the same color and shade; distortions, wrinkling, looseness of adhesion to the base are not allowed;

For pasting surfaces with wallpaper, the following adhesives are used: KMTs glue, bustilate glue, polyisobutylene glue, PVA emulsion, gumilax adhesive mastic, polylax.

3.14. Washing surfaces. Application of plaster mortar to the surface by a mechanized method. To obtain a plaster of improved and high quality, as well as when applying plaster in a mechanized way on the surfaces to be plastered, it is necessary to install beacons.

The surfaces are pre-hung: vertical - with a plumb line; horizontal - with a rail with a level;

On the fixed surface, they throw marches of gypsum mortar and on them strips of mortar 4-5 cm wide are made - beacons;

Plastering units (SO-38, SO-57, SO-180, SO-187), installations (SO-46, SO-50, SO-49), station SO-114A are used to apply plaster mortar on the surface;

The solution is applied to the surfaces to be plastered from hoses through nozzles;

Plastering is leveled with plastering machines. Mechanized application of solutions on surfaces is used for large volumes of work.

3.15. The surfaces to be plastered are leveled to avoid the formation of a basting of excessive thickness. With significant deviations from the vertical or horizontal (over 40 mm), as well as local irregularities, defective places are covered with a metal mesh. The surfaces to be plastered must be rough for firm adhesion to the plaster. For this, the concrete surfaces must be incised. Wooden surfaces are upholstered with shingles or piece shingles. Places of conjugation of structures made of different materials, as well as protruding concrete and reinforced concrete, brick and wooden parts (cornices, belts, etc.), in the case of applying a plaster coating on them with a thickness of more than 20 mm, should be covered with a metal mesh with mesh sizes before plastering 10 x 10 mm or with a weave of wire with meshes up to 40 x 40 mm. The average thickness of the plaster coating with improved surface plastering should not exceed 13 mm. Each subsequent layer of plastering is allowed to be applied only after the previous one has set. The solution is applied to the surface with plastering buckets or trowels from portable boxes (dimensions 100 x 60 x 30 cm, with trays 60 cm high) with handles for carrying them. Plastering is leveled with half-graters, crinkles, rules, templates. The plaster is repaired with the same composition as the original plastering. The weakened layer of plaster should be beaten off with a hammer to the base, the broken parts of the plaster should be removed with a spatula, scraper or trowel point. Moisten the plaster around the hole with water. For improved plastering and repair of plaster, the following plaster solutions are used: lime - for plastering internal stone walls, cement-lime - for plastering damp walls, lime-gypsum - for plastering wooden surfaces, cement - for plastering external surfaces.

3.16. Terrazite decorative mortar is prepared from cement, sand, lime, stone chips pigment, mica or broken glass (1: 3: 6: 1.5: 1/5 volume of lime: 0.1). A stone-like decorative solution is made from the same components, however, before preparing the solution, the materials selected and measured according to the remainder must be carefully sieved through a sieve with 3 x 3 mm cells (1: 0.5: 3: 0.5: 1/20 of the volume of lime: 0 , 3). To make an insulating mortar, it is necessary to prepare a lime mortar with light fillers: pumice or tuff fines, sawdust, slags (1: 1 - 1: 3). For the repair of plasters in rooms with high humidity, a cement mortar is prepared from sand and cement (1: 2.5 - 1: 6) or cement-lime (1: 0.4: 6 - 1: 1: 10). The preparation of solutions is carried out by thoroughly mixing the components until a homogeneous dry mixture and water is added in small portions with simultaneous stirring until the required density of the solution is obtained.

3.17. When painting in two colors, the ceiling and a narrow upper wall in one color, and the rest of the wall with a different color, the narrow part of the upper wall is separated from the rest of the wall with a thin strip of paint by a panel. In high rooms, a wide strip is drawn - a frieze or tapestry 60 ... 100 cm wide. The remaining lower part under the frieze and tapestry - the panel is separated from it by a panel. Panels are pulled out with paneled brushes using a ruler, evenly planed with a chamfer along the dividing lines broken off by a populated cord. One-tone stencil printing is carried out using high-quality glue painting by rolling with rollers.

3.18. Take measures to immediately eliminate the causes and conditions that may cause downtime, accidents or other damage, and if it is not possible to eliminate these reasons on their own, immediately notify the Vedas about this. power engineer or other official.

3.21. To undergo induction, primary at the workplace, repeated, unscheduled and targeted briefings, training in labor protection and safety, testing of knowledge on labor protection.

3.22. Observe the rules and regulations of labor protection, fire safety and industrial sanitation.

3.23. Stop the operation of machines, mechanisms and other equipment, if there is a threat to life and health, and immediately notify the leading engineer of the RES.

3.24. Carry out safe storage, transportation and use of radioactive, poisonous, explosive, flammable and other substances and materials.

3.25. Comply with the requirements of regulatory enactments on labor protection, instructions, rules for handling equipment and other means of production, use collective and individual protective equipment.

3.26. Comply with labor protection obligations stipulated by the collective agreement and internal labor regulations.

3.27. Observe the labor protection rules when working according to the instruction N.

3.28. To undergo preliminary and periodic medical examinations in a timely manner (at least once a year).

3.29. Cooperate with the administration in organizing safe and harmless working conditions, personally take all feasible measures to eliminate any industrial situation that poses a threat to his life and health or the people around him and the natural environment.

Inform about the danger of the ved. RES engineer or other official.

3.30. Immediately inform the Ved. to the RES engineer about the accidents at work and ensure the provision of timely medical assistance to the injured.

3.31. Inform the ved. to an engineer of the distribution zone or the chief of staff of civil defense and emergency situations on the prerequisites for an emergency at the facilities.

3.32. To carry out their duties as part of the non-staff formation of the health center of the sanatorium.

3.33. Know the warning signals of the GO and the procedure for acting on them.

3.34. To take part in the promotion of civil defense issues among the employees of the sanatorium.

3.35. Provide first aid to the injured.

3.36. Work on improving their qualifications by constantly studying advanced work experience, attending business qualifications classes held at the sanatorium.

3.37. Fulfill the requirements of general moral and ethical standards and deontology.

3.38. Observe the work schedule and work discipline.

3.39. To be at the workplace in a sober state and in a satisfactory state of health that does not interfere with the performance of

their functional responsibilities.

3.40. Give a written explanation about the violation of labor or production discipline (absenteeism, appearance at work in a drunken state or other misconduct).

3.41. To actively participate in the social life of the team.

3.42. To take part in the sanitary days (hours), subbotniks for the improvement of the sanatorium territory. On a cleaning day (hour), carry out cleaning, whitewashing, painting in your room (at your workplace), in common areas and on the assigned territory of the sanatorium, as well as digging and weeding flower beds, mowing grass, cleaning weeds, dry foliage and grass , take care of plants, etc.

3.43. Ensure the complete safety of the property entrusted to him. Take good care of the property of the sanatorium and take urgent measures to prevent damage.

3.44. Comply with the requirements of the collective agreement.


General provisions 1.1. The plasterer is a worker and reports directly to ……… (name of the position / profession of the manager) 1.2. To work as a plasterer, a person is accepted who has mastered the programs of vocational training, retraining and additional vocational education on the basis of general secondary education. 1.3. To work specified in clause 1.2 of this instruction, a person is allowed: 1) passed in accordance with the Procedure for conducting mandatory preliminary and periodic medical examinations (examinations) of workers engaged in heavy work and in work with harmful and (or) dangerous working conditions, approved ...

By order of the Ministry of Health and Social Development of Russia of 12.04.2011 N 302n, mandatory preliminary (upon admission to work) and periodic medical examinations (examinations), as well as extraordinary medical examinations (examinations); 2) with at least 1 year of work experience in accordance with the specialization or in the presence of secondary vocational education and the condition of passing in the organization of a professional qualification exam to confirm the qualification category in accordance with the specialization - without requirements for work experience. 1.4. ……… (other general provisions) 2. Requirements for knowledge and skills 2.1.
The materials and tools laid at a height should be installed and secured securely in order to prevent them from falling. 3.13. Plasterers-painters working on each other should not be located on the same vertical or be in places where objects can fall.
3.14.

Indoor painting work using compounds that emit harmful volatile vapors must be performed when open; windows or with artificial ventilation. 3.15. In places where nitro paints and other substances that form explosive vapors are used, actions using fire or causing sparks are prohibited.


Electrical wiring in such rooms must be explosion-proof. 3.16. Cleaning equipment for the preparation of paints and painting equipment should be carried out with a tool made of non-ferrous metal that does not produce sparks (aluminum, copper, brass brushes, scrapers, etc.), in compliance with safety precautions. 3.17.

Instructions

Pasting of wall surfaces with paper, plain and medium-density wallpaper, fabrics, high-quality wallpaper, leatherette, wood wallpaper, etc. 2.23. Change of overlapped and back-to-back wallpaper. 2.24. Stencil staining in two or more tones.


2.25.

Important

Decorating wall surfaces according to sketches with adhesives in two to four tones. 2.26. Copying and cutting stencils of any complexity. 2.27.


Wallpapering ceilings. 2.28. Removing stains on glued surfaces. 2.29. Washing plastering and painting mechanisms and tools at the end of work.
2.30. [

Enter what you want]. 3. Rights The plasterer-painter has the right to: 3.1. For all social guarantees provided by law.

3.2. Make suggestions to the immediate supervisor to improve the work related to the responsibilities provided for in this job description. 3.3.

Job description of the painter

If you notice a violation of the instructions by other workers or a danger to others, do not remain indifferent, warn the worker and inform the foreman about the need to comply with the requirements that ensure the safety of work. It is forbidden to use paints and varnishes and solvents of unknown composition, to replace less toxic solvents with more toxic ones.

When cleaning the surface from rust, scale, old paint, as well as when sanding the putty surface, work in valveless anti-dust respirators of the "petal" type. When preparing solutions, use personal protective equipment. 3.20. In the rooms where products are painted and paints are prepared, at least two people must be at the same time.

Labor protection instruction for painter-plasterer

Director General of LLC "ACCOUNTING ONLINE.RU" Dmitriev S.A. OFFICE INSTRUCTIONS SHTUKATURA-MALYAN This job description has been developed and approved in accordance with the provisions of the Labor Code of the Russian Federation and other regulations governing labor relations in the Russian Federation. 1.

GENERAL 1.1. The plasterer-painter belongs to the category of workers and is directly subordinate to the general director. 1.2. A person with secondary education without any requirements for work experience is accepted for the position of a plasterer-painter.
1.3. During the absence of the plasterer-painter, his duties are performed by an employee appointed by order of the General Director. 1.4.

Job description of a plasterer-painter

Employees are provided with the necessary protective clothing and protective equipment in accordance with current regulations. Overalls should be stored in special lockers separate from personal clothing. 2.

Attention

Safety requirements before starting work. 2.1. Tidy up the overalls. Check that personal protective equipment and safety devices are in good condition.


2.2. Carefully prepare the workplace for safe work, remove unnecessary objects that interfere with work, make sure there is sufficient lighting. 2.3. Immediately inform the foreman about all noticed faults at the workplace and about the dangers that have arisen. 2.4. Before starting plastering work at a height, the plasterer-painter, together with the foreman, must check the serviceability of the scaffolding, fences of the working platform, ladders and sliding ladders. Scaffolding and scaffolding (platforms) must have a railing with a height of at least 1 m.

Job description of a 4-grade plasterer-painter

Labor protection instructions for the plasterer-painter Added on 01/16/2013 Training on labor protection for managers and specialists This labor protection instruction for the plasterer-painter is available for free viewing and download. 1. GENERAL LABOR PROTECTION REQUIREMENTS 1.1. Persons who are at least 18 years old, fit for health reasons, trained in safe methods and techniques of work, who have passed a knowledge test and are allowed to work independently, are allowed to perform plastering and painting work.

Each employee must know well and strictly follow all the requirements set out in this manual. 1.3. Persons who do not follow this instruction are held accountable in accordance with the internal labor regulations of the enterprise. 1.4.

Job description of the 5th grade plasterer-painter

Mechanized application of mortar to walls and other surfaces, finishing plastering. 2.12. Ironing the surface of the plaster. 2.13. Installation and fastening of frames for valves and shutters.

Installation of residential ventilation devices with verification of their operation and strengthening of suspensions and brackets. 2.15. Grouting the finishing layer. 2.16. Painting frames with oil paint.

2.17. Putting, priming and priming surfaces manually and with a power tool. 2.18. Leveling the filler. 2.19. Priming of surfaces with brushes, rollers, hand-operated spray guns, power tools and high-pressure units. 2.20. Facing and fluting surfaces. 2.21. Trimming the edges of the wallpaper. Batch cutting of wallpaper on the machine. 2.22.

Job description of a plasterer-painter of the 2nd category

Mechanized application of mortar to walls and other surfaces, finishing plastering. 2.12. Ironing the surface of the plaster. 2.13. Installation and fastening of frames for valves and shutters. 2.14. Installation of residential ventilation devices with verification of their operation and strengthening of suspensions and brackets. 2.15. Grouting the finishing layer. 2.16. Painting frames with oil paint. 2.17. Putting, priming and priming surfaces manually and with a power tool. 2.18. Leveling the filler. 2.19. Priming of surfaces with brushes, rollers, hand-operated spray guns, power tools and high-pressure units. 2.20. Facing and fluting surfaces. 2.21. Trimming the edges of the wallpaper. Batch cutting of wallpaper on the machine. 2.22.

We bring to your attention a typical example of the job description of a 5th grade plasterer, sample 2019/2020. A person with education and work experience can be appointed to this position. Do not forget, each instruction of a 5th grade plasterer is handed out against a receipt.

Typical information on the knowledge that a 5th grade plasterer should have is presented on. About duties, rights and responsibilities.

This material is included in the huge library of our site, which is updated daily.

1. General Provisions

1. Plasterer of the 5th category belongs to the category of workers.

2. A 5th grade plasterer is a person who has: _________ (requirements for education, work experience)

3. Plasterer of the 5th grade is accepted for the position and dismissed from the position of the ________ organization on the proposal of _________. (director, head) (position)

4. A 5th grade plasterer should know:

a) special (professional) knowledge:

- ways of performing high quality plaster;

- technology and methods of decorative plastering of facades;

- techniques for marking and dividing the surfaces of the facade and internal surfaces;

- device of templates for pulling rods;

- methods of making waterproofing, gas-insulating, sound-absorbing, heat-resistant, X-ray-proof plasters.

- instructions for the use, operation, storage of devices, tools, measuring instruments and other technical means used in their work.

- sketches and drawings directly used in the process of work.

- requirements for the quality of work on related construction processes.

- professional requirements for a worker in a given profession of a lower grade;

b) general knowledge of an employee of the organization:

- rules for labor protection, industrial sanitation and fire safety;

- rules for using personal protective equipment;

- the requirements for the quality of work (services) performed, for the rational organization of work in the workplace;

- assortment and marking of materials used, consumption rates of fuels and lubricants;

- rules for the movement and storage of goods;

- types of marriage and ways to prevent and eliminate it;

- industrial signaling.

5. In his activities, the Plasterer of the 5th category is guided by:

- the legislation of the Russian Federation,

- Charter (statute) of the organization,

- orders and orders of the _________ organization, (general director, director, head)

- this job description,

- The rules of the internal labor regulations of the organization.

6. Plasterer of the 5th category reports directly to ________ (a worker with a higher qualification, the head of production (site, workshop) and the director of the organization)

7. During the absence of the Plasterer of the 5th category (business trip, vacation, illness, etc.), his duties are performed by a person appointed by ________ of the organization (position of the head) on the presentation of ________ (position) in the prescribed manner, who acquires the corresponding rights, obligations and bears responsibility for the performance of the duties assigned to him.

2. Job responsibilities of the 5th grade plasterer

Labor duties of the 5th grade Plasterer are:

a) Special (professional) duties:

- Application of mortar to curved surfaces by hand and mechanized methods.

- Surface finishing by spray.

- High quality plaster of walls, ceilings, pillars, pilasters and columns of constant cross-section, smooth and fluted.

- Plastering of flat ceilings with caissons of any shape.

- Application of decorative solutions to the surface and their processing by hand and with a power tool.

- Pulling of rods of constant cross-section with all types of solutions on rectilinear surfaces with cutting corners.

- Marking and cutting of rustic stones on plastered surfaces, including facades.

- Facade decoration with decorative plaster.

- Arrangement of self-leveling floors and bases for floors.

- Repair of decorative plaster of facades in separate places and high-quality plaster of internal surfaces of buildings.

- Coating of surfaces with waterproofing, gas-insulating, sound-absorbing, heat-resistant and X-ray-proof solutions.

- Performing work of workers of lower qualifications in this profession.

- Leadership of workers of lower grades of the same profession.

b) General duties of an employee of the organization:

- Compliance with the Internal Labor Regulations and other local regulations of the organization, internal rules and regulations of labor protection, safety, industrial sanitation and fire protection.

- Fulfillment of the orders of employees within the framework of the employment contract, by whom it was repaired in accordance with this instruction.

- Carrying out work on acceptance and delivery of a shift, cleaning and washing, disinfection of serviced equipment and communications, cleaning of the workplace, devices, tools, as well as keeping them in proper condition.

- Maintaining the established technical documentation.

3. Rights of a plasterer of the 5th category

A 5th grade plasterer has the right to:

1. Submit proposals to the management:

- to improve the work related to the obligations provided for by this instruction,

- on bringing to material and disciplinary responsibility of employees who have violated production and labor discipline.

2. To request from the structural divisions and employees of the organization the information necessary for him to perform his duties.

3. To get acquainted with the documents defining his rights and obligations in the position held, the criteria for assessing the quality of the performance of official duties.

4. To get acquainted with the draft decisions of the organization's management concerning its activities.

5. Require the management of the organization to provide assistance, including the provision of organizational and technical conditions and the execution of the established documents necessary for the performance of official duties.

6. Other rights established by the current labor legislation.

4. Responsibility of the 5th grade plasterer

A 5th grade plasterer is liable in the following cases:

1. For improper performance or non-performance of their official duties provided for by this job description - within the limits established by the labor legislation of the Russian Federation.

2. For offenses committed in the course of their activities - within the limits established by the current administrative, criminal and civil legislation of the Russian Federation.

3. For causing material damage to the organization - within the limits established by the current labor and civil legislation of the Russian Federation.

Job description of the 5th grade plasterer - sample 2019/2020. Responsibilities of a 5th grade plasterer, rights of a 5th grade plasterer, responsibility of a 5th grade plasterer.

Job descriptionplasterer-painter[name of organization, enterprise, etc.]

This job description has been developed and approved in accordance with the provisions and other regulatory legal acts governing labor relations in the Russian Federation.

1. General Provisions

1.1. The plasterer-painter belongs to the category of workers and is directly subordinate to [the position of the immediate supervisor].

1.2. For the position of a plasterer-painter, a person is accepted who has [enter the required] education without presenting requirements for work experience.

1.3. During the absence of the plasterer-painter, his duties are performed by [position, full name].

1.4. The plasterer-painter should know:

Rules for labor protection, industrial sanitation and fire safety;

Rules for the use of personal protective equipment;

Requirements for the quality of work performed, for the rational organization of work in the workplace;

Assortment and marking of materials used, material consumption rates;

Types of marriage and ways to prevent and eliminate it;

Types of materials used in the production of plastering, painting and wallpapering and sandless surface coating;

Methods for preparing surfaces for painting, pasting and finishing work;

Name, purpose and rules for the use of hand tools, devices and equipment;

Properties of materials, compositions and ready-made solutions used in the production of plastering, painting and wallpapering;

Arrangement and operating rules for trimming machines, trowels, mobile painting stations, mechanisms for preparing and mixing putty compounds, machines for mechanized application of plaster and putty;

Types of plasters and plaster solutions, methods of their preparation;

Methods for cutting wallpaper and making glue;

Methods for arranging ventilation ducts;

Properties of solutions with chemical additives (chloride solutions, solutions with the addition of potash, calcium chloride), retarders and setting accelerators and rules for handling them;

Methods for performing improved plaster;

Methods for mechanized application of solutions and gunning of surfaces;

Methods for the selection of paint compositions.

2. Job responsibilities

The following job duties are assigned to the plasterer-painter:

2.1. Coating surfaces with simple or improved plaster and plaster repair, plaster maintenance.

2.2. Solid surface alignment.

2.3. Cutting surfaces with a power tool.

2.4. Preparation of mortars from dry building mixtures on cement, gypsum and other bases.

2.5. Troweling of boxes and joints of large-panel partitions.

2.6. Grinding plaster.

2.8. Application of plaster mortar to the surface using a mortar pump.

2.9. The device is a sandless coating for high-quality painting.

2.10. Cutting joints between slabs of precast concrete floors, wall panels.

2.11. Mechanized application of mortar to walls and other surfaces, finishing plastering.

2.12. Ironing the surface of the plaster.

2.13. Installation and fastening of frames for valves and shutters.

2.14. Installation of residential ventilation devices with verification of their operation and strengthening of suspensions and brackets.

2.15. Grouting the finishing layer.

2.16. Painting frames with oil paint.

2.17. Putting, priming and priming surfaces manually and with a power tool.

2.18. Leveling the filler.

2.19. Priming of surfaces with brushes, rollers, hand-operated spray guns, power tools and high-pressure units.

2.20. Facing and fluting surfaces.

2.21. Trimming the edges of the wallpaper. Batch cutting of wallpaper on the machine.

2.22. Pasting of wall surfaces with paper, plain and medium-density wallpaper, fabrics, high-quality wallpaper, leatherette, wood wallpaper, etc.

2.23. Change of overlapped and back-to-back wallpaper.

2.24. Stencil staining in two or more tones.

2.25. Decorating wall surfaces according to sketches with adhesives in two to four tones.

2.26. Copying and cutting stencils of any complexity.

2.27. Wallpapering ceilings.

2.28. Removing stains on glued surfaces.

2.29. Washing plastering and painting mechanisms and tools at the end of work.

2.30. [Enter what you want].

3. Rights

The plasterer-painter has the right:

3.1. For all social guarantees provided by law.

3.2. Make suggestions to the immediate supervisor to improve the work related to the responsibilities provided for in this job description.

3.3. Require the management of the enterprise to assist in the performance of their duties.

3.4. Receive materials and information on issues of their activities.

3.5. To get acquainted with the draft decisions of the management of the enterprise concerning its activities.

3.6. For the free distribution of certified special clothing, special footwear and other personal protective equipment.

3.7. [Enter what you want].

4. Responsibility

The plasterer-painter is responsible for:

4.1. For non-fulfillment, improper fulfillment of the duties provided for by this instruction, within the limits determined by the labor legislation of the Russian Federation.

4.2. For offenses committed in the course of carrying out their activities - within the limits determined by the administrative, criminal and civil legislation of the Russian Federation.

4.3. For causing material damage to the employer - within the limits determined by the labor and civil legislation of the Russian Federation.

The job description is developed in accordance with [name, number and date of the document]

HR manager

[initials, surname]

[signature]

[day month Year]

Agreed:

[initials, surname]

[signature]

[day month Year]

I have read the instructions:

[initials, surname]

[signature]

[day month Year]